BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//RailEI - ECPv6.18.4.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.railei.org
X-WR-CALDESC:Events for RailEI
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20210328T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20211031T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20220327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20221030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20230326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20231029T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20240331T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20241027T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20250330T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20251026T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20270328T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20271031T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20261110T153000
DTEND;TZID=Europe/London:20261110T164500
DTSTAMP:20261006T161936Z
CREATED:20261006T160941Z
LAST-MODIFIED:20261006T161936Z
UID:10001377-1794324600-1794329100@www.railei.org
SUMMARY:Innovative Radar-based Ground Investigation for Rail Infrastructure Projects
DESCRIPTION:David Capstick\, Associate Director Business Development\, Central Alliance\nLancaster\, Barrow and Carlisle Section in-person meeting\nCentral Alliance recently completed a “First of a Kind” study at the site of the proposed Thorpe Park station between Leeds and York\, in which the use of its award-winning Multiband Synthetic Aperture Radar (SAR) system allowed the presence of shallow mine workings to be identified. Network Rail alone manages thousands of these legacy mining-related risks\, which present a significant challenge to the maintenance\, renewal\, and construction of transport infrastructure across the UK\, and remain poorly defined using conventional intrusive investigation techniques. \nThe presentation demonstrates how the SAR system\, mounted on an unmanned aerial vehicle\, was able to acquire high resolution subsurface data to depths of approximately 20 metres\, from which a high resolution three dimensional model of the underground workings was produced by correlating the radar responses obtained with historical borehole information. This model accurately delineated the extent and geometry of the mine workings relative to key surface assets\, including rail infrastructure\, highways\, and buildings\, thus demonstrating how the use of remote Multiband SAR sensing technologies can reduce engineering uncertainty\, lower project costs and improve operational safety. \nTransport available between railway station main entrance and venue at 15:00\, returning for 17:00 approximately. Light refreshments will be available before the meeting starts at 15:30. \nIf you are a RailEI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/innovative-radar-based-ground-investigation-for-rail-infrastructure-projects/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20261013T150000
DTEND;TZID=Europe/London:20261013T170000
DTSTAMP:20261002T152807Z
CREATED:20260928T103100Z
LAST-MODIFIED:20261002T152807Z
UID:10001334-1791903600-1791910800@www.railei.org
SUMMARY:M6 Clifton Bridge Replacement
DESCRIPTION:Warren Rigby\, Design Manager and John Holmes\, Project Manager\, Skanska UK\nLancaster\, Barrow and Carlisle Section in-person meeting\nThis presentation will provide an overview of the replacement of the bridge carrying the West Coast Main Line over the M6 motorway at Clifton\, Cumbria. The project involved the demolition of the existing 1960 post-tensioned structure and the design\, fabrication and installation of a new 130 metre bridge structure within a highly constrained environment above one of the UK’s busiest motorways and rail corridors. The presentation will contain an account of the planning and execution of the works\, including stakeholder collaboration\, innovation and management of interfaces with both the railway and National Highways; it will also reflect on the key challenges encountered\, lessons learned\, and the benefits achieved through early contractor involvement and close collaboration across the project team. \nPlease meet at Preston Station under the PALS Memorial at the top of the subway steps to Platforms 3 and 4 at 15:00. You’ll be escorted into the venue from there. Light refreshments will be available before the meeting starts at 15:30. \nIf you are a RailEI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/m6-clifton-bridge-replacement/
LOCATION:Network Rail\, Preston\, Network Rail Ltd\, North Union House\, Christian Road\, Preston\, PR1 2NB\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2026/09/M6-Clifton-Bridge-Replacement-scaled.jpg
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20260414T163000
DTEND;TZID=Europe/London:20260414T180000
DTSTAMP:20260318T162125Z
CREATED:20251013T143729Z
LAST-MODIFIED:20260318T162125Z
UID:10001130-1776184200-1776189600@www.railei.org
SUMMARY:Development of Pandrol Track Fastening Product Range
DESCRIPTION:Steve Curphey\, Sales Manager UK\, Pandrol\nLancaster\, Barrow and Carlisle Section in-person meeting\nThe company began its existence in the UK in 1937 as the Elastic Rail Spike Company\, which opened its manufacturing plant at Worksop in Nottinghamshire shortly afterwards. In 1957 Per Rande Rolfsen invented the uniquely shaped spring clip which became specified as a standard track fastening on the UK rail network within a decade\, resulting in the change of name to Pandrol in 1972. Today’s range of products has expanded to include equipment which enhances the efficiency of railway maintenance and construction\, sustainable resilient systems which extend the life of track and electrification catenary systems. \nThis presentation focuses on the track fastening product range\, highlighting the milestones which have occurred in its development. It also details innovations which have contributed to the efficient installation of permanent way\, with associated reductions in carbon emissions and improved safety. \nMeeting in person from 16:00 for a 16:30 start. Light refreshments provided. \nIf you are a RailEI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/development-of-pandrol-track-fastening-product-range/
LOCATION:NR Whitehaven\, North Shore Road\, Whitehaven\, CA28 6AX\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20260310T163000
DTEND;TZID=Europe/London:20260310T180000
DTSTAMP:20260224T181137Z
CREATED:20251013T142509Z
LAST-MODIFIED:20260224T181137Z
UID:10001129-1773160200-1773165600@www.railei.org
SUMMARY:Learning from the Grange-over-Sands Derailment
DESCRIPTION:Tony Butler\, Inspector of Rail Accidents\, Rail Accident Investigation Branch (RAIB)\nLancaster\, Barrow and Carlisle Section in-person meeting\nIn the early morning of 22nd March 2024\, a passenger train travelling at 56 mph derailed on the approach to Grange-over-Sands station between Carnforth and Barrow. The derailment occurred because a void had opened in the embankment on which the train was travelling\, leading to the rails under the train losing support. Nobody was injured\, but significant damage was caused both to the train and the railway infrastructure. \nThis presentation focuses on a key underlying factor in connection with the accident\, namely the absence of effective management of flood water by multiple parties over a significant historical period; this led to a prolonged need to rely on temporary pumping arrangements\, which effectively became permanent. The contributory roles of Victorian infrastructure and increasing rainfall due to climate change are also highlighted\, together with changes in land management practice in the vicinity of the accident site. \nMeeting in-person from 16:00 for a 16:30 start. \nTransport will be provided from Carlisle Station main entrance at 16:00\, returning for 18:00 (approximately) after the meeting courtesy of Network Rail. \nIf you are a PWI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/learning-from-the-grange-over-sands-derailment/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20260210T163000
DTEND;TZID=Europe/London:20260210T180000
DTSTAMP:20260204T112038Z
CREATED:20251202T151622Z
LAST-MODIFIED:20260204T112038Z
UID:10001164-1770741000-1770746400@www.railei.org
SUMMARY:Potential Gains Through Climate Change Adaptation on WCML North
DESCRIPTION:Olivia Devan\, Principal Route Engineer (DOT)\, Network Rail\nLancaster\, Barrow and Carlisle Section in-person meeting\nSince 2006 the West Coast Main Line has been closed north of Lancaster for over 100 days due to extreme weather\, costing more than £25 million. This figure would be even higher if the costs to the wider community were included. The situation will only worsen if a holistic approach to weather management is not adopted\, working with partners across the wider catchment area and looking beyond the confines of the railway boundary. By working in this way\, the benefits to both the railway and the wider community can be maximised\, while reducing the total financial investment required by Network Rail. \nThis presentation will outline what collective climate action might look like at key pinch points such as Carlisle and Shap\, focusing on improvements in safety\, reliability\, biodiversity\, and carbon sequestration. \nMeeting in person from 16:00 for a 16:30 start. Light refreshments provided. \nThose attending should assemble at Preston railway station below the Preston Pals War Memorial plaque (adjacent to the subway stairs on Platforms 3 and 4) at 16:15. They will then be accompanied from the Memorial to North Union House to join the meeting. \nIf you are a PWI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/potential-gains-through-climate-change-adaptation-on-wcml-north/
LOCATION:Network Rail\, Preston\, Network Rail Ltd\, North Union House\, Christian Road\, Preston\, PR1 2NB\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20260113T153000
DTEND;TZID=Europe/London:20260113T170000
DTSTAMP:20260105T164109Z
CREATED:20251013T141312Z
LAST-MODIFIED:20260105T164109Z
UID:10001128-1768318200-1768323600@www.railei.org
SUMMARY:Electrification Between Wigan and Bolton
DESCRIPTION:Mark Cowgill\, Senior Project Manager and Simon Skinner\, Engineering Director\, SPL Powerlines\nLancaster\, Barrow and Carlisle Section in-person meeting\nThis presentation will provide an account of the involvement of SPL Powerlines in the £100 million scheme to electrify 6.5 route miles between Wigan and Bolton\, exploring both technical and collaborative aspects. It will include an explanation of the rationale behind the electrification of this key section of the railway and an outline of the scope of works\, together with project requirements. The complexities of project set-up will be explained\, including the contractual framework and the collaborative approaches adopted to overcome challenges. \nThe presentation will also examine the robust quality assurance processes that underpinned delivery and the critical steps leading to successful system entry into service. A unique perspective will be shared on the events of New Year’s Eve\, when the theft of a feeder cable close to the opening date had to be overcome\, underlining the resilience and adaptability of the teams involved. The lessons learned during the project will also be highlighted. \n**PLEASE NOTE THE EARLIER TIME** Meeting in person from 15:00 for a 15:30 start. Light refreshments provided. \nIf you are a PWI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/electrification-between-wigan-and-bolton/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20251216T163000
DTEND;TZID=Europe/London:20251216T180000
DTSTAMP:20251119T125127Z
CREATED:20251013T135632Z
LAST-MODIFIED:20251119T125127Z
UID:10001127-1765902600-1765908000@www.railei.org
SUMMARY:Derailment and Fire at Summit Tunnel
DESCRIPTION:John Worswick\, Retired Bridge Engineer\nLancaster\, Barrow and Carlisle Section in-person meeting\nOn 20th December 1984 a train of tank wagons carrying petroleum products was derailed in Summit Tunnel\, which is located between Rochdale and Todmorden on the Calder Valley route between Manchester and Leeds. In this presentation John Worswick\, who was called out to the incident and was present as the disaster unfolded\, explains the involvement of the rail staff and emergency services as they assessed the immediate aftermath of the derailment; he also outlines the events which took place\, including an explosion followed by a major fire\, causing the closure of the route to traffic until August 1985. His account includes both contemporary newsreel coverage and also film of the contractor undertaking repair works to the tunnel\, involving relining damaged brick tunnel sections\, securing the tunnel walls with rock bolts and replacing 550 yards of track and sleepers. \nThis is the Christmas social meeting\, which includes a buffet served from 16:00 onwards. It represents a particular opportunity in the section calendar for recently joined members to meet others in a social setting. \nMeeting in person from 16:00 for a 16:30 start. \nEmpire Services Club\nHartington Road\nPreston\nPR1 8PP \nDirections: The club is located by leaving Preston station via the main access road and turning left to walk down Fishergate as far as the second traffic signals junction (Hartington Road) on the right. The premises are located adjacent to the junction (total distance from station 0.4 miles). Limited on-street parking is available on Hartington Road opposite the club. \nIf you are a PWI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/derailment-and-fire-at-summit-tunnel/
LOCATION:Empire Services Club\, Hartington Road\, Preston\, PR1 8PP
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20251111T163000
DTEND;TZID=Europe/London:20251111T180000
DTSTAMP:20251103T165601Z
CREATED:20251013T133813Z
LAST-MODIFIED:20251103T165601Z
UID:10001126-1762878600-1762884000@www.railei.org
SUMMARY:The Construction and Maintenance of Private Sidings
DESCRIPTION:Jamie Kelly\, Programme Manager\, Metro & Rail Projects\, VolkerRail Ltd\nLancaster\, Barrow and Carlisle Section in-person meeting\nVolkerRail has existed since 2009 as a leading railway infrastructure contractor for both new line construction and the updating of existing railway infrastructure\, having evolved from Grant Lyon & Co. in the early 1950s. The presentation highlights the firm’s involvement in sidings construction projects for both private and public sector clients\, focusing on the recently completed reinstatement and reconnection of Horton-in-Ribblesdale Quarry siding on the Settle and Carlisle line for Heidelberg Materials. This has included both permanent way and signalling upgrade works\, allowing aggregates to be supplied once again by rail to major construction projects.\nVolkerRail also has significant involvement nationally in the maintenance of siding layouts. Maintenance regimes for the private sidings layouts at Sellafield and BAE Systems in Barrow are featured\, together with regimes at layouts with special characteristics such as the British Steel Scunthorpe very heavy rail system\, where permanent way is exposed to exceptionally heavy loads. \nMeeting in-person from 16:00 for a 16:30 start. Light refreshments available. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/the-construction-and-maintenance-of-private-sidings/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20251014T153000
DTEND;TZID=Europe/London:20251014T180000
DTSTAMP:20251009T145137Z
CREATED:20251007T144641Z
LAST-MODIFIED:20251009T145137Z
UID:10001125-1760455800-1760464800@www.railei.org
SUMMARY:Development of Train-based Overhead Line Inspections on the West Coast Main Line
DESCRIPTION:Towards RailEI: Proposed Name Change – A short briefing from Past President Steve Whitmore and Chief Executive Stephen Barber on the vision for the future of the PWI and forthcoming ballot of members about a possible name change for the Institution. \nMartin Catterall\, Electrification & Plant Maintenance Engineer and Gareth Kinghorn\, Infrastructure Maintenance Engineer\, Network Rail\nLancaster\, Barrow and Carlisle Section in-person meeting\nThis presentation focuses on the development of an alternative regime to the standard ‘B01’ foot patrol for the basic inspection of OLE equipment on the West Coast Main Line\, which makes significant use of train-borne video recording and also analysis using artificial intelligence. The motivation for this development was the phasing out of foot patrol inspections employing the lookout-operated warning system (LOWS) by Network Rail: this resulted in a need to meet the inspection criteria set out in standards without the availability of significant track access during normal train running\, and the section of WCML between Carnforth and Carlisle\, where LOWS was predominantly employed\, was adopted for the trials. The resulting ‘B01-A’ desktop-based inspection regime is the first of its kind on Network Rail\, and consideration is given to the potential for further improvements to this regime\, such as the use of a dedicated Class 153 inspection vehicle; this would also facilitate the inspection of track bonding. \nThose attending should assemble at Preston railway station below the Preston Pals War Memorial plaque (adjacent to the subway stairs on Platforms 3 and 4) at 15:15\, if attending the first meeting\, or 16:15\, if attending the second. They will then be accompanied from the Memorial to North Union House to join the meeting in each case. \nMeeting in-person from 15:15 for a 15:30 start for those wishing to hear from Stephen Barber and Steve Whitmore. The main presentation will take place from 16:15 for a 16:30 start. \nLight refreshments available before and between meetings. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/development-of-train-based-overhead-line-inspections-on-the-west-coast-main-line/
LOCATION:Network Rail\, Preston\, Network Rail Ltd\, North Union House\, Christian Road\, Preston\, PR1 2NB\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20250408T163000
DTEND;TZID=Europe/London:20250408T180000
DTSTAMP:20250319T114651Z
CREATED:20241205T162157Z
LAST-MODIFIED:20250319T114651Z
UID:10000885-1744129800-1744135200@www.railei.org
SUMMARY:Track Renewals on Eskmeals Viaduct
DESCRIPTION:Christopher Littler\, Network Rail\nLancaster\, Barrow and Carlisle Section in-person meeting\nThis presentation describes the £4.5million track renewal programme on Eskmeals Viaduct\, which was carried out by Network Rail over a seventeen day blockade in September 2024 and constitutes one of the largest projects completed by the newly created North West Route Works Delivery Team during the 2024-25 year. Notable features of the work on the 285m long steel structure\, which is located on the Cumbrian Coast Line between Bootle and Ravenglass\, included the replacement of timber waybeams with longitudinal synthetic wooden baulks made of fibre-reinforced foamed urethane (FFU) and also the replacement of defective softwood with composite sleepers. The role of the FFU manufacturer\, Sekisui\, in liaising with the project team both before and during the work on site is highlighted\, the adoption of alternative materials forming part of Network Rail’s wider policy to improve sustainability in track renewal processes. \nMeeting in-person from 16:00 for a 16:30 start. Light refreshments available. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/track-renewals-on-eskmeals-viaduct/
LOCATION:NR Whitehaven\, North Shore Road\, Whitehaven\, CA28 6AX\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2024/12/Eskmeal-Viaduct.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20250311T163000
DTEND;TZID=Europe/London:20250311T180000
DTSTAMP:20250219T172803Z
CREATED:20241011T145811Z
LAST-MODIFIED:20250219T172803Z
UID:10000831-1741710600-1741716000@www.railei.org
SUMMARY:Trilink: The intelligent renewal of West Coast Main Line North
DESCRIPTION:David Gordon\, Network Rail\nLancaster\, Barrow & Carlisle Section in-person meeting\n‘We’re only replacing a set of points…’ This presentation will detail the development of the Trilink programme from problem statement through to the specific allocation of funds as part of Network Rail’s control period funding award. Through the programme assets on the West Coast Main Line between Weaver Junction and Carlisle will be renewed ‘intelligently’ using a pragmatic (as opposed to like-for-like) approach\, resulting in better functionality with fewer assets by placing them in the optimum location. Account will be taken of notable changes in the nature of WCML operation since 1974\, in particular the abolition of locomotive-hauled passenger trains and increased length of freight trains. The scope of the renewals fundamentally covers track\, signalling and telecommunications (adoption of European Train Control System (ECTS)) and overhead line electrification assets.\nThe development work has involved the consultation of network customers and a collaborative cross-industry approach; some unexpected elements have emerged in areas which would not have been identified through a single discipline approach. One potential option under consideration is the provision of a loop at Carnforth via the operational platforms\, which would allow through WCML services to call. The generation of infrastructure options through ‘intelligent renewals’ thinking in relation to the Carlisle area will also be demonstrated\, including an invitation to the audience to participate and discuss. \nMeeting in-person from 16:00 for a 16:30 start. \nTransport will be provided from Carlisle Station main entrance at 16:00\, returning for 18:00 (approximately) after the meeting courtesy of Network Rail. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/trilink-the-intelligent-renewal-of-west-coast-main-line-north/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20250211T163000
DTEND;TZID=Europe/London:20250211T180000
DTSTAMP:20250131T103901Z
CREATED:20241011T145009Z
LAST-MODIFIED:20250131T103901Z
UID:10000830-1739291400-1739296800@www.railei.org
SUMMARY:TRU: Huddersfield to Leeds – Delivering on the ground
DESCRIPTION:Stuart Witts\, BAM Nuttall\nLancaster\, Barrow and Carlisle Section in-person meeting\nThe presentation will provide an insight into the ongoing works to deliver major railway infrastructure enhancements on the busy Transpennine rail corridor between Huddersfield and Leeds\, which connects major cities in the North. This section of route will see a huge amount of work over the coming years to deliver additional tracks\, major station upgrades\, line speed increases and the installation of overhead line equipment. After several years in the planning and development phase\, the works are now fully mobilised on site within this section of route. \nThe last twelve month period has been particularly busy on the ground\, with works undertaken to the track\, stations\, bridges and earthworks. In addition a large amount of preparatory work has been undertaken\, such as a programme of works to treat historic mining activity across the route. The specific engineering and operational challenges presented by the Grade I listed station at Huddersfield will be outlined in the presentation\, together with the proposed works. \nMeeting in-person from 16:00 for a 16:30 start. Light refreshments available. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/tru-huddersfield-to-leeds-delivering-on-the-ground/
LOCATION:Network Rail\, Preston\, Network Rail Ltd\, North Union House\, Christian Road\, Preston\, PR1 2NB\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2024/10/TRU-Huddersfield-scaled.jpg
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20250114T163000
DTEND;TZID=Europe/London:20250114T180000
DTSTAMP:20241129T171751Z
CREATED:20241011T143349Z
LAST-MODIFIED:20241129T171751Z
UID:10000829-1736872200-1736877600@www.railei.org
SUMMARY:Improved Management of Infrastructure and Operations Using AI
DESCRIPTION:Tim Flower\, Konux GmbH\nLancaster\, Barrow & Carlisle Section in-person meeting\nIn this presentation Tim Flower describes and explains how the application of KONUX software to the UK rail network makes smarter\, data-driven decisions possible.\nKONUX Switch provides predictive maintenance for rail switches. It uses advanced machine learning to monitor the health of these critical assets\, enabling rail operators to reduce delays\, extend the lifespan of infrastructure\, and improve network reliability. \nKONUX Traffic is a decision support solution for rail traffic operators. By utilising train movement data and algorithms based on neural networks\, it helps identify and address bottlenecks\, improve punctuality\, and optimize capacity utilization without adding new infrastructure. In case of disruptions\, the solution offers recovery strategies to minimise network-wide impacts. \nBoth software products maximise the advantages provided by artificial intelligence (AI) and the interconnection of devices networked together in industrial applications (the ‘Industrial Internet of Things’) to optimise the planning of railway operations and railway maintenance\, addressing key challenges in their respective areas. \nMeeting in-person from 16:00 for a 16:30 start. \nTransport will be provided from Carlisle Station main entrance at 16:00\, returning for 18:00 (approximately) after the meeting courtesy of Network Rail. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/predictive-analysis-of-sc-renewals-using-artificial-intelligence/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20241217T163000
DTEND;TZID=Europe/London:20241217T180000
DTSTAMP:20241211T101539Z
CREATED:20241001T142338Z
LAST-MODIFIED:20241211T101539Z
UID:10000824-1734453000-1734458400@www.railei.org
SUMMARY:The Sorry Saga of Great Musgrave Bridge
DESCRIPTION:Graeme Bickerdike\, Railway Historian\, Writer and Campaigner\nLancaster\, Barrow and Carlisle Section in-person meeting\nThe retrenchment of the British railway network in the 1950s and 1960s left a lasting physical legacy in the form of thousands of disused structures scattered across Britain’s landscape. Most have heritage value as a reminder of our pioneering past\, some have been reclaimed by nature as part of wildlife corridors and many have the potential to be incorporated into future sustainable transport routes. But do asset management regimes in Britain recognise this potential?\nThe controversial burial of a handsome masonry arch bridge in Cumbria – without any engineering justification or engagement with community stakeholders – heaped reputational damage on its custodian\, National Highways\, and prompted the Government to intervene and stop the company’s infilling and demolition programme as engineers\, politicians and active travel campaigners expressed their dismay at its negative social impacts.\nGraeme Bickerdike examines how National Highways got it so wrong and looks at what has changed to ensure there will be no recurrence. \nThis is the Christmas social meeting\, which includes a buffet served from 16:00 onwards. It represents a particular opportunity in the section calendar for recently joined members to meet others in a social setting. \nMeeting in person from 16:00 for a 16:30 start. \nEmpire Services Club\nHartington Road\nPreston\nPR1 8PP \nDirections: The club is located by leaving Preston station via the main access road and turning left to walk down Fishergate as far as the second traffic signals junction (Hartington Road) on the right. The premises are located adjacent to the junction (total distance from station 0.4 miles). Limited on-street parking is available on Hartington Road opposite the club. \nIf you are a PWI member please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/the-sorry-saga-of-great-musgrave-bridge/
LOCATION:Empire Services Club\, Hartington Road\, Preston\, PR1 8PP
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2024/10/Great-Musgrave-Bridge.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20241112T163000
DTEND;TZID=Europe/London:20241112T180000
DTSTAMP:20241030T115324Z
CREATED:20241011T142016Z
LAST-MODIFIED:20241030T115324Z
UID:10000828-1731429000-1731434400@www.railei.org
SUMMARY:The Northumberland Line Project
DESCRIPTION:Roger Glenville\, Programme Manager\, Network Rail\nLancaster\, Barrow & Carlisle Section in-person meeting\nThe Northumberland Line project is a scheme which has been promoted under the Restoring Your Railways initiative\, involving the reintroduction of passenger services between Newcastle and Ashington via Blyth onto an existing freight route serving Lynemouth power station. In his capacity as Programme Manager Roger Glenville will explain how this multi-discipline project has been carried out\, including the renewal of plain line track and S&C along the route between Ashington and Northumberland Park\, where interchange with the Nexus Metro network will be available\, and the construction of six new stations and structures along the route with associated resignalling. A feature of the project has been the engagement with communities along the reconstructed length of route\, which will be operated by Northern on opening in December 2024. \nMeeting in-person from 16:00 for a 16:30 start. \nTransport will be provided from Carlisle Station main entrance at 16:00\, returning for 18:00 (approximately) after the meeting courtesy of Network Rail. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/the-northumberland-line-project/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20241008T163000
DTEND;TZID=Europe/London:20241008T180000
DTSTAMP:20240930T123552Z
CREATED:20240916T163244Z
LAST-MODIFIED:20240930T123552Z
UID:10000817-1728405000-1728410400@www.railei.org
SUMMARY:Timetable Planning
DESCRIPTION:Rob Cummings\, Northern Trains and Vice President North West England & North Wales\, PWI\nLancaster\, Barrow and Carlisle Section in-person meeting\nRailways are a guided form of transport\, which can mean that a rail corridor is narrower than an equivalent roadway and can have a high throughput of traffic\, if used efficiently. However the system does not allow overtaking (outside a loop) and requires the controlled separation of traffic moving at different speeds and making conflicting moves at junctions.\nThe timetable provides this control\, but also comprises the railway’s offering to the public who want to use it\, and determines the costs incurred in the form of fleet size\, train mileage (fuel and maintenance) and train crew requirements. In this presentation Rob Cummings\, Seasonal Performance Improvement Manager\, will describe the process of timetable planning and explain the conflicts in space and resource that have to be resolved in order for a timetable to be created. \nMeeting in-person from 16:00 for a 16:30 start. Light refreshments available. \nIf you are a PWI member\, please book your space if would like this event to be automatically recorded in your CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/timetable-planning/
LOCATION:Network Rail\, Preston\, Network Rail Ltd\, North Union House\, Christian Road\, Preston\, PR1 2NB\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20240608T113000
DTEND;TZID=Europe/London:20240608T151500
DTSTAMP:20240415T163952Z
CREATED:20240122T124205Z
LAST-MODIFIED:20240415T163952Z
UID:10000691-1717846200-1717859700@www.railei.org
SUMMARY:PWI Annual Intersection Quiz 2024
DESCRIPTION:PWI Social Event\nPlease save the date in your diary and gather a team together between 2-4 persons to represent your local section. \nThe PWI Intersection Quiz will be held on Saturday 8 June from 11:30 for a 12:00 buffet followed by the quiz from 13:00 to 15:15 at The Griffin Pub Restaurant\, 1 Court Square\, Carlisle CA1 1QY. \nIf there are any keen quizzers ready for a trip to Carlisle to have their railway & general knowledge tested with a chance to win the Hadrian Shield please contact Phil Benzie lbc@thepwi.org
URL:https://www.railei.org/event/pwi-annual-intersection-quiz-2024/
LOCATION:The Griffin\, 1 Court Square\, Carlisle\, CA1 1QY
CATEGORIES:Community,Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/New-National-Technical-Rules.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20240409T163000
DTEND;TZID=Europe/London:20240409T180000
DTSTAMP:20240409T115439Z
CREATED:20240409T115439Z
LAST-MODIFIED:20240409T115439Z
UID:10000727-1712680200-1712685600@www.railei.org
SUMMARY:Elastic Solutions for Railway Structures
DESCRIPTION:Andy Moore\, Getzner Werkstoffe GmbH\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: The presentation will demonstrate how elastic solution products can protect permanent way infrastructure. The main vehicles for these improvements are under-sleeper pads\, under-ballast mats and mass spring systems\, which collectively can protect the track structure\, extend its lifetime and lower annual maintenance requirements\, and examples are given of application of these products to rail links such as the Krakow airport link in Poland and the Daqin coal railway in North China\, which exhibits some of the heaviest tonnages (highest MGT) in the world. The mitigation of noise and vibration in other affected structures will also be covered\, with beneficial applications including a concert hall in Munich which is located in the immediate vicinity of a tunnel on the S-Bahn network. A review is also provided of the current level of application of these products to Network Rail by route. \nMeeting in-person from 16:00 for a 16:30 start. Light refreshments available. \nIf you are a PWI member please login before registering if would like this event to be automatically recorded in your PWI CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/elastic-solutions-for-railway-structures/
LOCATION:NR Whitehaven\, North Shore Road\, Whitehaven\, CA28 6AX\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2023/10/Elastic-Solutions-for-Railway-Superstructure.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20240312T163000
DTEND;TZID=Europe/London:20240312T180000
DTSTAMP:20240305T161348Z
CREATED:20231016T141713Z
LAST-MODIFIED:20240305T161348Z
UID:10000576-1710261000-1710266400@www.railei.org
SUMMARY:Construction and installation of a WCML Underbridge at Ravenscraig
DESCRIPTION:Graeme McInnes and Craig Robertson\, Story Contracting\nPWI Presidential Visit\, Steven Bell\, President\, PWI\nLancaster\, Barrow & Carlisle Section in-person meeting\nSynopsis: The Ravenscraig project\, which involved the casting and subsequent movement of a 5000 tonne underbridge into position on the West Coast Main Line\, was a significant engineering intervention undertaken in 2023. The record-breaking bridge installation was the culmination of years of meticulous planning\, and showcased the collaborative approach between multiple organisations. North Lanarkshire Council funded the scheme in partnership with Scotland’s Railway\, which was delivered by Story Contracting supported by key supply chain partners. \nThe presentation will detail the key elements – from inception through to successful delivery – of a nine day blockade which took place in April 2023. The critical challenges\, and the innovative techniques which were employed to overcome them\, will also be covered. \nMeeting in-person from 16:00 for a 16:30 start. \nTransport will be provided from Carlisle Station main entrance at 16:00\, returning for 18:00 (approximately) after the meeting courtesy of Network Rail. \nIf you are a PWI member please login before registering if would like this event to be automatically recorded in your PWI CPD portfolio. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/construction-and-installation-of-wcml-underbridge-at-ravenscraig/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2023/10/Ravenscraig.jpg
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20240213T163000
DTEND;TZID=Europe/London:20240213T180000
DTSTAMP:20240207T114640Z
CREATED:20240207T114640Z
LAST-MODIFIED:20240207T114640Z
UID:10000708-1707841800-1707847200@www.railei.org
SUMMARY:Evolution of the Grand Trunk Route between Preston and Carlisle
DESCRIPTION:Philip Benzie\, MPWI\nLancaster\, Barrow & Carlisle Section in-person meeting\nSynopsis: In the fiftieth year since completion of West Coast Main Line electrification in 1974\, this presentation traces the construction and subsequent role of the section of route\nbetween Preston and Carlisle in railway communication between London and Scotland. This includes an examination of the alternative route alignments which were proposed between Lancaster and Carlisle before the route chosen was constructed and opened in December 1846\, and how the physical characteristics of the route\, including the presence of Shap Summit\, have influenced its operation. \nNetwork development during the London & North Western Railway era added branch lines\, and the character of passenger and freight services which developed through to the LMS and British Rail eras is also covered. The electrification of the line at 25kV AC\, which was approved in 1970\, involved significant civil engineering works along the route\, and the changes in levels of service for passengers and freight following its completion are highlighted. \nMeeting in-person from 16:00 for a 16:30 start \nIf you are a PWI member please login before registering if would like this event to be automatically recorded in your PWI CPD portfolio. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/evolution-of-the-grand-trunk-route-between-preston-and-carlisle/
LOCATION:NR Carnforth\, Warton Road\, Carnforth\, LA5 9ET\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20240116T163000
DTEND;TZID=Europe/London:20240116T180000
DTSTAMP:20240109T121119Z
CREATED:20231016T135445Z
LAST-MODIFIED:20240109T121119Z
UID:10000575-1705422600-1705428000@www.railei.org
SUMMARY:The role of the Regional Facilities Manager
DESCRIPTION:Dave Billington\, Network Rail\nLancaster\, Barrow & Carlisle Section in-person meeting\nSynopsis: The Supply Chain Operations Directorate of Network Rail\, which operates within its Route Services function\, is responsible for the operation of as many as eleven separate types of depot throughout the UK from the north of Scotland to Cornwall. Dave Billington begins his presentation by explaining the different functions of these depots\, which range from specialised materials supply and manufacturing sites for permanent way and civil engineering tasks through to seasonal stabling depots for maintenance vehicles\, and appraising the current conditions at these sites across the network. From this he goes on to demonstrate the rationale for the creation\, in 2019\, of a national Regional Facilities team with a remit to investigate\, evaluate and implement improvements at these locations\, which were previously overlooked in terms of investment and constitute the workplace for a significant number of members of Network Rail staff; in particular they frequently harbour significant levels of legacy risk. Several examples of relatively small but effective modernisation projects at depot sites are presented\, together with a description of their impact on performance indicators at a local and national level. \nMeeting in-person from 16:00 for a 16:30 start. Transport available between railway station and venue\, courtesy of Network Rail. \nIf you are a PWI member please login before registering if would like this event to be automatically recorded in your PWI CPD portfolio. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/the-role-of-the-regional-facilities-manager/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20231219T163000
DTEND;TZID=Europe/London:20231219T180000
DTSTAMP:20231109T150310Z
CREATED:20231016T134419Z
LAST-MODIFIED:20231109T150310Z
UID:10000574-1703003400-1703008800@www.railei.org
SUMMARY:How Dr Beeching saved the railways\, and set the scene for the current rail renaissance
DESCRIPTION:Tim Kendell\, Retired Railway Civil Engineer\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: Dr Beeching has a reputation for destroying the railway system in Great Britain\, but is it deserved and was his report all bad news? Tim Kendell’s presentation reviews the growth of the railway network from the Stockton and Darlington Railway in 1825 to a network of nearly 18\,000 route miles in 1961. The two world wars took a severe toll on the railways\, and he goes on to review the fitness for purpose of the post-war Modernisation Plan and the associated state of railway finances. Something had to be done and Dr Beeching was chosen to devise the solution. Tim looks at all that was in the report – not just the closures – from the perspective of sixty years on\, and considers what would have happened\, had it not been enacted.\nTim first worked for British Rail in 1972 at the start of the true modernisation. He has seen the resurgence of the railway since that time and has experienced sectorisation\, followed by privatisation and partial renationalisation. He describes how all parts of the railway industry have grown since Beeching\, enabled by his reforms. \nMembers and visitors are warmly invited to attend this Christmas social meeting\, which includes a buffet\, courtesy of The PWI\,  from 16:00 onwards and represents a particular opportunity for recently joined members to meet others in a social setting. \nMeeting in-person from 16:00 for a 16:30 start. \nEmpire Services Club\nHartington Road\nPreston\nPR1 8PP \nDirections: The club is located by leaving Preston station via the main access road and turning left to walk down Fishergate as far as the second traffic signals junction (Hartington Road) on the right. The premises are located adjacent to the junction (total distance from station 0.4 miles). Limited on-street parking is available on Hartington Road opposite the club. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/how-dr-beeching-saved-the-railways-and-set-the-scene-for-the-current-rail-renaissance/
LOCATION:Empire Services Club\, Hartington Road\, Preston\, PR1 8PP
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20231114T163000
DTEND;TZID=Europe/London:20231114T180000
DTSTAMP:20231108T110028Z
CREATED:20231016T133224Z
LAST-MODIFIED:20231108T110028Z
UID:10000573-1699979400-1699984800@www.railei.org
SUMMARY:Track buckling resistance and the maintainer – How did we get where we are today?
DESCRIPTION:Andy Franklin\, Principal Project Engineer [Track & Lineside] \, Network Rail and Vice President\, PWI\nLancaster\, Barrow & Carlisle Section in-person meeting\nSynopsis: In this technical presentation Andy Franklin\, Principal Project Engineer (Track and Lineside)\, reviews both some theory of track buckling resistance and also lessons learned. The focus is on buckles of continuous welded rail (CWR)\, but with recognition that many issues are common to both CWR and jointed track. \nAndy begins by looking at the underlying principles of how track resists buckling\, and continues by exploring some learning from past track buckles\, together with how these lessons have influenced the standards and procedures which we use today. He goes on to consider some common threads in the causes of track buckling. \nMeeting in-person from 16:00 for a 16:30 start. Transport available between railway station and venue\, courtesy of Network Rail. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/track-buckling-resistance-and-the-maintainer-how-did-we-get-where-we-are-today/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2023/10/Aftermath-of-track-buckle-at-Tattenhall-Junction.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20231024T163000
DTEND;TZID=Europe/London:20231024T180000
DTSTAMP:20231019T082134Z
CREATED:20231012T165549Z
LAST-MODIFIED:20231019T082134Z
UID:10000569-1698165000-1698170400@www.railei.org
SUMMARY:Petteril Bridge derailment - reactive recovery works
DESCRIPTION:Mark Evans\, Senior Programme Manager – Civils\, Network Rail\nLancaster\, Barrow & Carlisle Section in-person meeting\nSynopsis: At 20:03 on 19th October 2022 the 17:15 Clitheroe to Carlisle Yard freight service derailed at Petteril Bridge Junction to the east of Carlisle railway station\, where the lines from Newcastle and Settle converge. The freight train involved was formed of a Class 66 locomotive and 14 loaded cement wagons\, and five of these wagons derailed. One of the derailed wagons subsequently entered the River Petteril. The derailment caused significant damage to an underbridge structure\, which required emergency works to allow the line to reopen to traffic. In this presentation Mark Evans\, Senior Programme Manager (Civils)\, will cover the site constraints and key challenges involved in restoring the line to traffic\, the reactive recovery operation by Network Rail’s internal delivery team and the additional works undertaken to structures and geotechnical assets facilitated by the temporary suspension of services. \nMeeting in-person from 16:00 for a 16:30 start \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/petteril-bridge-derailment/
LOCATION:NR Carnforth\, Warton Road\, Carnforth\, LA5 9ET\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2023/09/Petteril-Bridge-scaled.jpg
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20230411T163000
DTEND;TZID=Europe/London:20230411T180000
DTSTAMP:20230419T143741Z
CREATED:20220927T102007Z
LAST-MODIFIED:20230419T143741Z
UID:10000416-1681230600-1681236000@www.railei.org
SUMMARY:Implementation of Through Alignment Design on the WCML
DESCRIPTION:Phil Kirkland\, PWI Vice President\, North East England\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: This presentation covers some aspects of the works involved in the implementation of the Through Alignment Design (TAD) process on the West Coast Main Line between Warrington and Carlisle. Phil Kirkland was seconded as a Project Delivery Manager for the works\, particularly in Cumbria\, and although the contract packages were delivered between 2003 and 2006\, some of the techniques and lessons learned are still valid and can serve as useful learning today. The purpose of the TAD contract was to ensure ‘Absolute Track Geometry’ for 125mph running where practicable and ‘Enhanced Passenger Speeds’ at other locations\, with the aspiration that in the future the permanent way would be maintained in such a way as to retain and adhere to the fixed geometry designed through the TAD process. Railtrack PLC awarded the packages to GrantRail Ltd.\, an innovative and forward-thinking contractor in UK track renewal delivery. The delivered contracts were particularly successful and established GrantRail\, and its successor VolkerRail\, as one of the leading on-track maintenance providers in the UK and Europe. \nMeeting in-person from 16:00 for a 16:30 start. Light refreshments available. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE \n 
URL:https://www.railei.org/event/lancaster-barrow-and-carlisle-section-in-person-meeting-april-2023/
LOCATION:NR Whitehaven\, North Shore Road\, Whitehaven\, CA28 6AX\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20230328T163000
DTEND;TZID=Europe/London:20230328T180000
DTSTAMP:20230322T155800Z
CREATED:20220927T101231Z
LAST-MODIFIED:20230322T155800Z
UID:10000415-1680021000-1680026400@www.railei.org
SUMMARY:Resurrecting Railways: Lessons from two Scottish projects
DESCRIPTION:Peter Heubeck\, Independent Consultant and FPWI\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: A number of closed rail routes have been reopened in Scotland in recent years. Peter Heubeck focuses on the two largest projects completed to date\, highlighting the best practices which were achieved during their reinstatement and also lessons which were learned. The Airdrie to Bathgate reopening has plugged a gap between two existing passenger services to provide an additional electrified route between Glasgow and Edinburgh\, while the reopened Borders Railway between Edinburgh Waverley and Tweedbank has re-established a diesel service on the former Waverley Route between Edinburgh and Carlisle. Peter also reviews the prospects for further extension of the Borders Railway south of Tweedbank to Hawick and beyond. \nMeeting in-person from 16:00 for a 16:30 start. Transport from station main entrance at 16:00\, return 18:00 approximately. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/resurrecting-railways-lessons-from-two-scottish-projects/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20230214T163000
DTEND;TZID=Europe/London:20230214T180000
DTSTAMP:20230206T134544Z
CREATED:20220927T100642Z
LAST-MODIFIED:20230206T134544Z
UID:10000414-1676392200-1676397600@www.railei.org
SUMMARY:Introduction to trackbed stabilisation and reinforced soil structures
DESCRIPTION:Peter Matthias\, Rail Lead\, Tensar International Ltd\nLancaster\, Barrow & Carlisle Section in-person meeting\nSynopsis: Tensar is a verified supplier and designer under the Railway Industry Supplier Qualification Scheme (RISQS)\, which has enabled direct client engagement on HS2\, Network Rail and Transport for London projects. This presentation will demonstrate how Tensar product technology is being applied both to enabling and main works on major rail infrastructure schemes to provide value to the client through reductions in cost\, time\, and carbon. There will be a dual focus on Tensar stabilisation products incorporated within the rail trackbed build-up\, and on reinforced soil structures relating to walls and slopes in a rail context. \nMeeting in-person from 16:00 for a 16:30 start \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/introduction-to-trackbed-stabilisation-and-reinforced-soil-structures/
LOCATION:NR Carnforth\, Warton Road\, Carnforth\, LA5 9ET\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20230117T163000
DTEND;TZID=Europe/London:20230117T180000
DTSTAMP:20230111T121447Z
CREATED:20220927T095951Z
LAST-MODIFIED:20230111T121447Z
UID:10000413-1673973000-1673978400@www.railei.org
SUMMARY:Developments in railway earthworks management
DESCRIPTION:Julian Harms\, Principal Engineer\, (Geotechnics)\, Network Rail\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: Network Rail is rightly expected to set a high standard in the management of its infrastructure\, and the regulatory demands are becoming ever tighter. Maintaining the performance of railway earthworks\, which were built to cost by manual labour more than a century ago\, poses a significant challenge to today’s asset engineers. In this presentation Julian Harms\, Principal Engineer (Geotechnics) at Network Rail Technical Authority\, explores some of the innovations which are being considered to manage safe performance against the backdrop of higher customer expectations\, extreme weather and an asset base well beyond its design life. Following the presentation there will be an opportunity to view a film which follows the process of repairing a landslip on the Settle and Carlisle line in 1988. \nMeeting in-person from 16:00 for a 16:30 start. Transport from station main entrance at 16:00\, return 18:00 approximately. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/developments-in-railway-earthworks-management/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/png:https://www.railei.org/wp-content/uploads/2021/03/CARLISLE.png
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20221220T163000
DTEND;TZID=Europe/London:20221220T180000
DTSTAMP:20221213T093619Z
CREATED:20220927T094719Z
LAST-MODIFIED:20221213T093619Z
UID:10000411-1671553800-1671559200@www.railei.org
SUMMARY:Light rail on the Fylde Coast:  A decade of hope
DESCRIPTION:Tim Kendell\, Light Rail Transit Association\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: Tim Kendell\, the Technical Director of the Light Rail Transit Association\, examines light rail developments in the Blackpool and Fylde Coast area. It features an account of the Blackpool Tramway extension from the Promenade to North Station\, which is currently under construction as part of the Talbot Gateway project\, and an analysis of the applicability of findings of a European research programme on light and heavy rail integration (in which the Fylde Coast region participated as a case study area) to the Fylde area\, including proposals for the South Fylde Line between Kirkham and Blackpool South. The potential reinstatement of the Fleetwood to Poulton line is also covered. \nMembers and visitors are warmly invited to attend this Christmas social meeting\, which includes a buffet\, courtesy of The PWI\,  from 16:00 onwards and represents a particular opportunity for recently joined members to meet others in a social setting. \nMeeting in-person from 16:00 for a 16:30 start. \n**NEW VENUE** \nEmpire Services Club\nHartington Road\nPreston\nPR1 8PP \nDirections: The club is located by leaving Preston station via the main access road and turning left to walk down Fishergate as far as the second traffic signals junction (Hartington Road) on the right. The premises are located adjacent to the junction (total distance from station 0.4 miles). Limited on-street parking is available on Hartington Road opposite the club. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/light-rail-on-the-fylde-coast-a-decade-of-hope/
LOCATION:Empire Services Club\, Hartington Road\, Preston\, PR1 8PP
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2022/09/Light-Rail-on-Flyde-coast.jpg
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20221108T163000
DTEND;TZID=Europe/London:20221108T180000
DTSTAMP:20221107T115544Z
CREATED:20220927T093722Z
LAST-MODIFIED:20221107T115544Z
UID:10000412-1667925000-1667930400@www.railei.org
SUMMARY:Next generation cast crossings
DESCRIPTION:Next generation cast crossings: Verified by computer modelling and unique physical testing – Hannah Persson\, Senior Engineer – Crossing Development\, Engineering & Assurance\, Progress Rail and VP Scotland\, PWI\nLancaster\, Barrow and Carlisle Section in-person meeting\nSynopsis: Progress Rail manufactures switch and crossing (S&C) layouts for use in domestic and international markets. Crossings are safety-critical components and Hannah’s novel work has considered the design and analysis of them. Through extensive first-of-their-kind practical trials and finite element modelling the research has assessed the crossing design\, enabling design modifications to be justified and incorporated into manufactured crossings. This has provided the foundation on which to extend the trials and consider how a crossing is affected\, often adversely\, by track voiding. \nHannah is a Senior Engineer at Progress Rail and PWI Vice President for Scotland. Her presentation provides an overview of Progress Rail\, the fundamentals of how a cast austenitic manganese steel (AMS) crossing is manufactured and the above-mentioned research\, which formed the basis of her PhD. \nMeeting in-person from 16:00 for a 16:30 start. Transport from station main entrance at 16:00\, return 18:00 approximately. \nIf you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio\, you will need to register for the event. BOOK YOUR SPACE HERE
URL:https://www.railei.org/event/next-generation-cast-crossings/
LOCATION:NR Carlisle\, Upperby Yard\, Tyne Street\, Carlisle\, CA1 2NP\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2022/09/Next-generation-cast-crossings.jpg
ORGANIZER;CN="Phil Benzie":MAILTO:lbc@railei.org
END:VEVENT
END:VCALENDAR