BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//RailEI - ECPv6.17.3.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.railei.org
X-WR-CALDESC:Events for RailEI
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20230326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20231029T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20240331T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20241027T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20250330T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20251026T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20240515T124500
DTEND;TZID=Europe/London:20240515T140000
DTSTAMP:20240409T161210Z
CREATED:20240409T160954Z
LAST-MODIFIED:20240409T161210Z
UID:10000728-1715777100-1715781600@www.railei.org
SUMMARY:GWR Fast Charge Battery Train Trial
DESCRIPTION:David Horton\, Chief Mechanical Engineer\, Great Western Railway\nWest of England Section hybrid meeting\n**PLEASE NOTE THE NEW VENUE** Kevin Morris\, Amey Consulting\, Floor 1\, Station Square\, Gloucester Street\, Swindon\, SN1 1GW \nSynopsis: The GWR Fast Charge Battery Train Trial is a project to test an automated ground-based charging system for battery trains. The system was originally invented by Vivarail Ltd\, who sadly went into administration at the end of 2022\, but with DfT and GWR support the project was revived. \nThe Fast Charging system is located at bay platform 5 at West Ealing station\, where the branch line to Greenford terminates. The train takes charge every time it visits West Ealing station\, to replenish the energy used in the previous round trip. The charging time at West Ealing is approximately 4 minutes\, no more than the normal turnaround time within the existing timetable. Other than a requirement to stop the train in the right place\, the charging system requires no involvement from the driver. \nThe purpose of the trial is to verify the behaviour of the Fast Charging system through all seasons\, to accumulate valuable data and experience about battery life in particular\, and to validate range and performance simulations of the train with ‘real world’ data. \nThe battery train itself is a 3-car variant of the Class 230; also designed and built originally by Vivarail\, converted from former London Underground D78 stock. It was approved for limited demonstration passenger carrying use during the 2-week COP26 climate change conference in Glasgow in November 2021. Implementation of the Fast Charge modifications started shortly afterwards\, and now it is owned and maintained by GWR. \nMeeting in person from 12:30 with light refreshments courtesy of the PWI for a prompt 12:45 start for all. \nYou can also join the meeting virtually through Microsoft Teams. \nJoin on your computer\, mobile app or room device \nClick here to join the meeting \nMeeting ID: 356 058 988 460\nPasscode: mWSYnB \nDownload Teams | Join on the web \nOr call in (audio only) \n+44 20 3321 5213\,\,887412185#   United Kingdom\, London \nPhone Conference ID: 887 412 185# \nIf you are a PWI member please login first before booking if would like this event to be automatically recorded in your PWI CPD portfolio. \nBOOK YOUR SPACE HERE
URL:https://www.railei.org/event/gwr-fast-charge-battery-train-trial/
LOCATION:Amey Consulting\, Station Square\, 1 Gloucester Street\, Swindon\, SN1 1GW\, United Kingdom
CATEGORIES:Section Meeting
ATTACH;FMTTYPE=image/jpeg:https://www.railei.org/wp-content/uploads/2024/04/Battery-train-scaled.jpg
ORGANIZER;CN="Simon Warren":MAILTO:western@railei.org
END:VEVENT
END:VCALENDAR