Loading Events

« All Events

  • This event has passed.

New station at Cambridge South – Project case study

05/06/2024 @ 17:45 - 19:00

Philip Holbourn, Director, Holbourn Engineering

Thames Valley Section hybrid meeting

Synopsis: Philip, the lead Network Rail engineer for the new station and associated infrastructure enhancements at Cambridge South, will describe the project to build the new station. It will include discussion of the station building, the complex systems integration, ‘Minimum Viable Product’ and Project SPEED principles being applied, and the wider infrastructure upgrades being implemented in the Cambridge area to facilitate the stations construction. Philip will outline the challenging timescales and pressures that exist, the integration with the Cambridge area re-signalling project, and discuss some of the unusual challenges imposed by external stakeholders

Meeting in-person from 17:00 for refreshments courtesy of the PWI for a 17:45 start for all.

You can also join the meeting virtually through Microsoft Teams.

Join on your computer, mobile app or room device

Click here to join the meeting

Meeting ID: 374 253 412 386
Passcode: UGucBz

Download Teams | Join on the web

Or call in (audio only)

+44 20 3321 5213,,187584588#   United Kingdom, London

Phone Conference ID: 187 584 588#

If you are a PWI member please login before registering if would like this event to be automatically recorded in your PWI CPD portfolio.

Details

Date:
05/06/2024
Time:
17:45 - 19:00
Event Category:
Event Website
https://www.thepwi.uk/calendar/event/view?id=1932

Organiser

Other

CPD Hours
1.5
RailEI Sections
Thames Valley

Venue