- This event has passed.
Hope Valley
15/10/2024 @ 18:00 - 19:30

Edd Harris, Senior Project Engineer, VolkerRail and Scott Hazeldine, Programme Engineering Manager, Network Rail
Nottingham & Derby Section in-person meeting
The Project aim was to remove several bottlenecks between Stockport and Sheffield to allow passenger trains to overtake slower freight trains along the line. A new signalling
scheme was required to improve efficiency and resilience.
From Design & Planning to Construction & Commissioning, many challenges were faced and overcome. Project also introduced the UKs first Alstom SmartIO signalling interlocking.
New track layouts, installed over earthworks and existing / new structures, whilst minimising the existing operational railway and environmental impacts.
Meeting in-person from 18:00 for a 18:30 start. Light refreshments available.
If you are a PWI member, please book your space if would like this event to be automatically recorded in your CPD portfolio.