- This event has passed.
Barking Riverside extension slab track – from design to construction
17/01/2023 @ 17:00 - 18:30

Barnaby Temple, Head of Consultancy & Engineering Services, Rhomberg Sersa
Nottingham & Derby Section in-person meeting
Synopsis: Barnaby will introduce the BRE project and go into details on some of the challenges faced in the design and cover how these were dealt with also in construction. These include track-structure interaction, tolerances and the challenges of real 3D and the UK first precast slab track S&C. The slab track was largely on a 1.5km long viaduct with over 30 separate structure decks and combined steep gradients, tight radii, a scissors crossover and terminus station.
Meeting in-person from 17:00 for a 17:30 start. Light refreshments available.
If you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio, you will need to register for the event. BOOK YOUR SPACE HERE


