- This event has passed.
Renewal of Vastern Road Bridge – 50 years on
07/06/2023 @ 17:45 - 19:00

Richard Watts, PWI Fellow, CEng, MICE, (retd.)
Thames Valley Section hybrid meeting
Synopsis: Fifty years ago, in 1973, construction work started to widen the 12 metre span Vastern Road underbridge east of Reading station to accommodate a 30 metre wide dual carriageway for Stage 3 of Reading Borough Council’s new Inner Distribution Road. This illustrated presentation explores the history of the site and describes the development of the bridge design using novel methods to minimise disruption to rail and road traffic and to reduce costs, including the use of parts of previous buried structures to support the new bridge. Also described are how the bridge design facilitated lowering of the road to increase headroom, and the construction of a tanking slab below it, by Reading Borough Council, and the later extension of the bridge for additional track and platform lengthening in connection with the 2011/13 Reading Station redevelopment scheme.
Meeting in-person from 17:00 for refreshments courtesy of the PWI for a 17:45 start for all.
You can also join the meeting virtually through Microsoft Teams.
Join on your computer, mobile app or room device
Click here to join the meeting
Meeting ID: 333 092 308 609
Passcode: xrr2tq
Download Teams | Join on the web
Or call in (audio only)
+44 20 3321 5213,,869758562# United Kingdom, London
Phone Conference ID: 869 758 562#
If you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio, you will need to register for the event. BOOK YOUR SPACE HERE


