- This event has passed.
Gatwick Station Project
06/04/2022 @ 17:45 - 19:00

Rasib Riffat, Track Design Engineer, TfL and Mircea Androne, CRE/Senior Track Design Engineer, Systra UK
Thames Valley Section meeting
Synopsis: Mircea and Rasib will talk about the redevelopment of Gatwick Airport’s station which will improve accessibility, enhance the passenger experience.
Platforms 5 and 6 will be widened to reduce crowding and improve pedestrian flow.
They will go through the track design and construction stages required to complete the track works.
They will talk about different sustainability aspects and materials used in the track formation which extended service life of the track structure and helped to reduce whole Life Cycle Costs.
This meeting can be joined either virtually or in-person.
Meeting in-person from 17:00 for a 17:45 start for all.
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/782277613
You can also dial in using your phone.
United Kingdom: +44 330 221 0088
Access Code: 782-277-613
If you are a PWI member and would like this event to be automatically recorded in your PWI CPD portfolio, you will need to register for the event. BOOK YOUR SPACE HERE


